LED Wall Day 3

It runs, at the end of the day.
  • We unpacked all the LED modules and installed them in the cabinets.
  • Only one small power glitch (a loose cable) during the installation.
  • All the panels are now powered and connected to the two Sony controllers.
  • Only two panels seem to need some adjustments, it might be resolved during the calibration phase.
  • Next week, we will start the calibration process to ensure everything is aligned and functioning correctly, and try to enable stereo 3D.
Production line: unpacking, checking, and installing the LED modules in the cabinets.
The last few modules...
The last one!
Missed a power cable, but it was an easy fix.
SAGE3 is on!